Logo Weiherer Bier
150 Jahre Weiherer Bier
de en it
Trenner/Dekoration
Kopfbild
Trenner/Dekoration

B(r)au Blog Part 6

Created on Jun 15, 2022

It goes on and on. The new malt silos, each with a capacity of 26 tons, had to be screwed together for a total of four days. In addition, the new fresh water (60 HL) and hot water tanks (350 HL) were delivered. The fresh water tank was initially set up between the filling station and the logistics hall. The crane then had to move to the exact spot where the brewhouse was later to stand. It was then placed precisely and then bolted to the foundation. The same was then done with the malt silos. Click through the picture gallery.

 
Don't miss anything!
Our archive with news
from the last years

Trenner/Dekoration
Trenner/Dekoration